Case Studies

Major Packaging Company, Tunisia

Type of work:  Design, supply and installation of a 3000 cfm oil free water cooled compressor system on site.  Turnkey project.

Project value:  £500,000

Glaston added value:  By having the expertise and freedom to identify the most efficient and effective equipment, we could offer the best solution for the customer. Our highly experienced engineers carried out the installation.

Nuclear industry, North West England

Type of work:  Design, build, supply and installation of compressed air treatment and air quality monitoring system.

Project value:  £15,000

Glaston added value:  By uniquely specifying and developing a system to meet the customer’s needs.

Research Laboratory, North Wales

Type of work:  Design, supply and installation of breathing air system to meet current legislation, offer automated control to cope with fluctuating levels of demand.

Project value:  £15,000

Glaston added value: By developing a bespoke compressor system and purifier with PLC control system fitted to the purifier to automatically cater for the fluctuating needs of this customer and achieve energy efficiency and cost savings.

Major Car Manufacturer, North West

Type of work:  Design, supply and installation of 600 cfm compressors to supply robots in refurbished car plant.

Project value:  £125,000

Glaston added value: Limited space dictated that the compressor system had to sit outside.  The system was therefore fully weather proofed to meet the customer’s needs and controlled by Glaston’s unique Airstar controllers.

University, Northern England

Type of work:  Design, supply and installation of HTM 22 compliant air compressor to supply compressed air to phantom heads in Dental school.

Project value:  £11,000

Glaston added value: A shortage of space required a bespoke solution. The system was containerised and sits outside the facility.

University, East Midlands

Type of work:  Design, supply and installation of air compressor system to supply air to indoor robotic milking facility for cows in the school of Agriculture.

Project value:  £10,000

Glaston added value:  A bespoke project in high technological facility requiring 24 hours a day, 7 days a week provision of compressed air.

technical drawing

Tel: +44 (0) 1695 51010

Glaston Compressor Services Ltd,
Greenhey Place, East Gillibrands,
Skelmersdale, Lancashire WN8 9SA, UK

Logos